Home














OUTLINE OF PROJECTS:

Below is a sampling of some of the projects Worldlink Integration Group, Inc. is or has recently performed.

* National Retailer with 600+ Locations in 38 States

Hypercom ICE6000 DUKPT Upgrade

Install upgraded credit module

POS upgrade

Logistics management and asset tracking

650 locations in 38 states

New Store Installations

Install new POS equipment and infrastructure

Throughout the United States

Support store on Day 1 of new store opening

Remodels

De-install and re-install new POS equipment

Upgrade infrastructure where applicable

Throughout the United States

Service Work

Various field service work pertaining to POS equipment and infrastructure

* Large National Discount Retailer (as a subcontractor)

Infrastructure Upgrade

Install 1-2 Cat5 drops

Install 1-2 120v electrical extensions up to 50’

Over 500 locations in 42 states

Install New Infrastructure and LAN Equipment

Install over 50 data drops and 2 Fiber drops per store

Install 8 – 10 new 120V electrical extensions per store

Throughout California

* National Fast Food Chain with over 2000 Locations

Service Work

Various field service work pertaining to POS equipment and infrastructure

Throughout the United States

* Regional Retailer with 300 Locations in the Western U.S.

Back Office Upgrade

300 Stores

8 Weeks

7 States

Installation of New Back Office Server, Hub and UPS

New Store Openings

Complete turnkey solution

Stage, configure, install and test new IBM POS system

Install Infrastructure

Throughout the Western United States

New Network PC Rollout

Install and test new PC

Configure network printer

172 Locations in California

Depot Maintenance

Maintain inventory of spare peripheral POS equipment

Manage all logistics of equipment to and from stores

Facilitate repair through the manufacturers

Asset tracking

Service Work

Various field service work pertaining to POS equipment and infrastructure

* Large National Retailer

Remodels

Complete Installation of New Infrastructure

Data, voice, Sound and Security Systems

* Large National Department Store Chain

802.11b Rollout

Install fiber & copper infrastructure

Install Cisco access point and hardware

Install electrical circuits

34 locations in 5 states

Various Store Infrastructure and Electrical Installation

Install Infrastructure – Copper and Fiber

Install and Test New Network Printer

Upgrade wireless LRT network

Install 120V Electrical circuits

Various Field Service Call Work Throughout the Western United States

Distribution Center Infrastructure Upgrade

Infrastructure – Copper and Fiber

Install wireless components in IDF’s

Install Symbol Access Ports throughout DC

* National Retailer

Install POS

Texas, California and Arizona

* Drug Store Chain in the Northwest

In the Pacific Northwest

Conduct site survey

Install infrastructure

Install Symbol access ports

Coverage test

* Distribution Facilities for National Retailer

California, Minnesota and Arizona

Conduct site survey

Install infrastructure

Install Symbol access ports

Coverage test

     
References available upon request.


To earn our clients trust, by meeting and exceeding their expectations on Price, Quality, Flexibility and Accountability

 

Home | About Us | Services | News | Login | Customers | Contact   

Copyright 2003 Worldlink Integration Group, Inc.
All rights are reserved worldwide.
Worldlink and Worldlink Integration are Trademarks of Worldlink Integration Group, Inc.
Last Updated:
04/20/04